Pourin' the slab
The foundation slab was poured today - we caught a lucky break with the weather, a nice dry weekend and no rain today, though it will roll in tonight. The building inspector was early as well, which helped, and things got rolling at about 9:45am. You could walk on it by 1:00pm. We had 5 and a half loads (58 cubic yards) of fiber concrete at 3000 p.s.i. - which means it's one hefty slab, hence the AC/DC soundtrack. Enjoy the iPhoto slideshow: